Skip to content

Selected milestones

Implementation snapshot · 2026-10-12 · Sources & update notes

This is a small teaching archive, not the full development history. Each result is dated and scoped to its recorded inputs. It must not be read as qualification of the current user’s vehicle.

DateCase studyWhy it matters
9 October 2026MVP checkpointA vehicle can pass preparation and limited motion tests while failing driving acceptance
10 October 2026Release-test correctionA telemetry guard can mistake detached free flight for structural failure
11 October 2026Sparse suspension armsFewer nodes and corrected appearance do not establish dynamic qualification
12 October 2026Material-input auditNumerical fitting cannot recover absent physical inputs

The local checkout retains the full README snapshot, detailed experiment documents and evidence collections. Only these summaries and selected illustrations are published. See current capabilities for the maintained overview.